Sonotube Concrete Forms Sonovoid Concrete Voids Blastmaster Blasting Tubes

Sonovoid® Round Void Forms
Installation

 

Storage

Sonovoid Round void forms should be kept dry before using:

Store in a vertical position or on a platform six inches above ground to avoid moisture.

  • Cover ends to keep out snow or rain.
  • If tube is in position and pouring is delayed, cover with a waterproof tarpaulin.
  • Do not pour if any part of the tube is wet.

Placement

  • Pour concrete to minimize movement of tubes.
  • Vibrating will ensure a smooth soft fit and encourage concrete to fill any gaps.
  • Vent tubes over 18” OD to release air and prevent excess pressure.

Spacing and holding down

To prevent flotation and shifting of forms when concrete is poured, lay Sonovoid Round void forms in place and anchor securely.

 

 

 

 

 

 

 

 

Sonovoid Round