Sonovoid® Carton Void Forms
Installation

 

Recommended construction procedures

  • Construction ground surface should be flat.
  • Protective hard board covering with a minimum thickness of 1⁄8” should be placed over Sonovoid concrete void forms before reinforcing steel placement, to prevent puncture.
  • Cover top of void forms with polyethylene, 4 mil minimum, and overlapping joints.
  • Extreme wet ground conditions may require a waterproof membrane to protect void forms. After forms are stripped, the protective membrane should be cut to allow moisture to penetrate.
  • Where fitting is required, wrap the area sufficiently to prevent penetration of water from wet concrete.
  • Storage of void forms should be dry prior to job site placement.
  • Do not exceed ACI recommended pour rates.
  • Do not let vibrator come in contact with void form, as this may result in carton damage.

 

 

 

 

 

 

 

 